A discontinued format part can put an otherwise suitable used machine at risk. Obtain the existing part number, revision and drawing. Ask the original machine builder or qualified supplier what equivalent can be assessed. Keep each proposed source tied to its own evidence and lead time.
Qualify both sources before relying on them
Record samples and the intended container, machine and cycle. Clarify whether a supplier provides a direct compatible part, refurbishment or a variant requiring an engineering review. Agree who signs off the fit and returns used parts or drawings.
| Field | Source A | Source B |
|---|---|---|
| Part number and revision | ___ | ___ |
| Proof of fit and material | ___ | ___ |
| Availability and lead time | ___ | ___ |
| Approval test and responsible person | ___ | ___ |
If a spare set fits the locating pins but the production pack comes out scratched, record the parts drawing revision, functional check and sample result separately. A second source is ready when the team can reorder the verified revision and reproduce the relevant check on the new delivery. On shared machines, list every format covered by that revision.
Review how the part availability affects equipment selection